29th November 2019
Work continued on The Stables to make them water-tight and improve the overall appearance. This is to make the stalls safe and look good. There is still much work to be done.



The floor at the foot of the internal staircase was permanently fixed. This took the volunteers a lot of effort to remove the temporary solution and make it good.



Some further work was carried out in the gents’ toilet. Fixing the last of the fireboard to the small patches that had been left. Also, mounting an excellent picture donated by John Symon.