Volunteers’ Morning

10th August 2019

A very windy Saturday curtailed activities and required some fixing of the roof. However, that did not dampen the spirit of the volunteers who stuck in during the morning. There was still a lot to do, and as usual, the team approached it with gusto.

  • From pulling down another ceiling in the hall area,
  • To make a start on the cleaning of the kitchen ceiling,
  • Actually, painting the bar ceiling,
  • More localised stripping of the bar windows to wire stripping
  • And tidying out the stables too!

Planning is underway for the next morning, so we can keep the pace going and finish the bar area ASAP.