25th October 2019
Sparkies were in again this week and removed the last connection from the main distribution box inside the stables, allowing the removal of the last cable protector across the main entrance.




Inside, we have been working on the finishing touches, such as putting up the feature mirror and the baby changing units in both the ladies and gents toilets. Oh, and installing a second TV for the Rugby World Cup semi-finals.





Disappointingly, some roof leaks reappeared, and the protective tarpaulin shifted. Roof work has now become a priority.